Infrastructure
Celtic Gateway Bridge
- Contract
- First and second fix wiring of lighting.
- Description
- Erection of a pedestrian access bridge connecting Holyhead dock with the town of Holyhead.
- Location
- Holyhead
- Contract summary
- The contract was to complete the wiring and installation of various LED lights on and around the bridge, access ramps and stairwells, as specified in the original tender.
Photos © Robert Thomas (robtphotography.weebly.com), used with permission. Anyone wishing to use these photos must ask Robert Thomas.




























